Rust-oleum Shop primer fast drying
Temporary metal protection
- Up to 1 year corrosion protection outside
- Ideal for construction, storage and transportation
- Masks construction deficiencies
- 12 m² per litre (at 35 micron)
- Ideal for spray application
- Lead- and chromate free
- Recoatable with CombiColor® and other coatings
Coverage
- Theoretical: 12 m²/l at 35 μm dry
- Practical: Practical coverage depends on many factors such as porosity and roughness of the substrate and material losses during application.
Drying times
- 20°C/50% r.h.
- 10°C/60% r.h.
- 30°C/50% r.h.
To touch:
- 1 hour
- 2 hours
- ½ hour
To handle:
- 2 hours
- 4 hours
- 1 hour
To recoat:
- After 24 hours
- After 36 hours
- After 24 hours
Full hardness:
- 7 days